Production Scheduling System Based on Customer Orders at AsMedia Percetakan Nganjuk

Melyka Ayu Ananda
Universitas Pembangunan Nasional “Veteran” Jawa Timur, Faculty of Economic and Business, Department of Management
Wiwik Handayani
Universitas Pembangunan Nasional “Veteran” Jawa Timur, Faculty of Economic and Business, Department of Management

Submission to VIJ 2024-09-10

Keywords

  • customer orders, gantt chart, priority principle, scheduling

Abstract

This research aims to identify the most effective production scheduling system at AsMedia Percetakan Nganjuk to reduce delays in order fulfillment. The proposed scheduling method is based on a priority rule system with the following criteria: First Come First Served (FCFS), Short Processing Time (SPT), Long Processing Time (LPT), and Earliest Due Date (EDD). Based on the results of data analysis and discussion, the First Come First Served (FCFS) and Earliest Due Date (EDD) methods are considered superior compared to the other methods. This is based on findings that show the effectiveness of the First Come First Served (FCFS) and Earliest Due Date (EDD) methods aligns with current criteria, including minimum average completion time, maximum utilization, minimum average number of jobs in the system, and minimum delays. Therefore, the researcher recommends that AsMedia Percetakan Nganjuk use the First Come First Served (FCFS) and Earliest Due Date (EDD) methods as alternative production scheduling methods. Given the relatively high average job delays with each method used, the company is deemed less effective in production scheduling. This is evident from the relatively high average job delays with each method used. Therefore, the solution the researcher can offer to AsMedia Percetakan Nganjuk is to increase the workforce and production machine capacity.

References

  1. Baker, Kenneth R. (2020). Introduction to Sequencing and Scheduling (3rd ed.). Retrieved from https://openlibrary.org/books/OL5047415M/Introduction_to_sequencing_and_scheduling
  2. Baker, Kenneth R., & Trietsch, Dan. (2019). Principles of Sequencing and Scheduling. Retrieved from https://books.google.co.id/books/about/Principles_of_Sequencing_and_Scheduling.html?id=33JyDwAAQBAJ&redir_esc=y.
  3. Fadli, Muhammad Rizal, & Wiwik Sulistyowati. (2019). Optimalisasi Penjadwalan Produksi Pipa Di Line 18 Dengan Metode First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt). PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 3(2), 44–54.
  4. Faris, Moh. Fahrul, & Handayani, Wiwik. (2021). Analisis Penjadwalan Produksi Berdasarkan Pesanan Menggunakan Metode Asas Prioritas pada CV Davero Cemerlang Indonesia Surabaya. Al-Kharaj : Jurnal Ekonomi, Keuangan & Bisnis Syariah, 4(2), 380–396. https://doi.org/10.47467/alkharaj.v4i2.676
  5. Gao, Jianfeng, & Chien, Chien Feng. (2021). Smart Manufacturing Scheduling Systems: Performance Analysis and Simulation-Based Optimization. Springer.
  6. Gulo, W. (2021). Metodologi Penelitian. Jakarta: Gramedia Widiasarana Indonesia.
  7. Hardani, Auliya, Nur Hikmatul, Andriani, Helmina, Fardani, Roushandy Asri, Ustiawaty, Jumari, Utami, Evi Fatmi, Sukmana, Dhika Juliana, & Istiqomah, Ria Rahmatul. (2020). Metode Penelitian Kualitatif & Kuantitatif (Husnu Abadi, ed.). CV. Pustaka Ilmu.
  8. Heizer, Jay, & Render, Barry. (2020). Operations Management (13th ed.). Salemba Empat.
  9. Heizer, Jay, & Render, Barry. (2021). Operations Management: Sustainability and Supply Chain Management (13th ed.). Retrieved from https://books.google.co.id/books/about/Operations_Management.html?id=XX7xoAEACAAJ&redir_esc=y
  10. Kiran, D. R. (2019). Production Planning and Control: A Comprehensive Approach. In Production Planning and Control. https://doi.org/10.1016/b978-0-12-818364-9.00036-6
  11. Pinedo, Michael L. (2020). Scheduling: Theory, Algorithms, and Systems (6th ed.). Retrieved from https://link.springer.com/book/10.1007/978-3-031-059
  12. Render, Jay, & Barry, Roberta M. (2020). Operations Management: Creating Value Along the Supply Chain (12th ed.).
  13. Safitri, Rosi Indah. (2019). Analisis Sistem Penjadwalan Produksi Berdasarkan Pesanan Pelanggan dengan Metode FCFS, LPT, SPT dan EDD Pada PD. X. Jurnal Optimasi Teknik Industri (JOTI), 1(2), 26. https://doi.org/10.30998/joti.v1i2.3840
  14. Sarwono, Jonathan. (2023). Metode Penelitian Kuantitatif & Kualitatif (6th ed.). Yogyakarta: Penerbit Andi.
  15. Siyoto, Sandu, & Sodik, Ali. (2021). Dasar Metodologi Penelitian Dr. Sandu Siyoto, SKM, M.Kes M. Ali Sodik, M.A. 1. Dasar Metodologi Penelitian, 1–109.
  16. Sugiyono. (2023). Metode Penelitian Kuantitatif, Kualitatif, dan R&D (18th ed.). Bandung: Alfabeta.
  17. Yowiantoro, Ferry. (2019). Penjadwalan Proyek Pembangunan Gedung Akuntansi Fakultas Ekonomi Universitas Jember menggunakan Metode Gantt Chart. Engineering.