VIJ Digital library
Articles

A STUDY OF RISK FACTORS AFFECTING CONSTRUCTION PROJECT EXECUTION IN THE CENTRAL REGION OF GHANA.

Frank Bentum Mensah
Department of Technical Education, Komenda College of Education
Godfred Tsotorvor
2Department of Building & Construction Technology Kpando Technical Institute
Engr.Michael K.Tsorgali
Department of Construction and Wood Technology Education
Francis Kodwo Fordjour
Department of Technical Education, Komenda College of Education

Published 2023-09-04

Abstract

The construction industry is one of the most dynamic, risky, and challenging businesses.  The number of risks present invariably goes beyond those found in other industries. The research was conducted with the aim of exploring the various risk factors affecting late execution of construction projects in the Central region of Ghana. Purposive sampling technique was used to select thirty (30) contractors of on-going projects for the study. Questionnaire was used to illicit information from the participants. Findings of the research revealed that financial, economic as well as political risk are the major factors contributing to late execution of construction projects in the central region of Ghana.

The conclusion drawn from the research indicated a lot of projects have not been completed. A thorough feasibility studies should be undertaken before any project is done.

References

  1. Ankrah N. A. (2007): An Investigation into the Impact of Culture on Construction Project Performance; PhD Thesis, University of Wolverhampton.
  2. Agyakwa-Baah, (2007). “Stakeholders‟ Perceptions of the Causes of Delay on Construction Projects”. BSc dissertation. Kwame Nkrumah University of Science and Technology, Kumasi, Ghana.
  3. Baxendale, A. T., & Schofield, T. J. (1986). “Planning and progressing project variations”. The Organization and Management of Construction: Shaping Theory and Practice, 2.
  4. Bender W., and Ayyub B., (2001). “Risk-based Cost Control for Construction.” Construction Management Department, Central Washington University.
  5. Berg, B. (2001). Qualitative Research Methods for Social Science. Boston: Allyn and Bacon.
  6. Berko, P. (2007). Project Cost Overrun in the Road Construction Industry in Ghana.
  7. Dey, R. (1997). Research methods for construction, Blackwell Science.
  8. Loosemore, M., Raftery J., and Reilly, C. (2006). Risk Management in Projects. United States: Taylor & Francis Group.
  9. De la Cruz, M.P., del Cano, A. and de la Cruz, E. (2006). ““Downside Risks in Construction Projects Construction Projects Developed by the Civil Service: The Case of Spain”,.” Journal of Construction Engineering and Management, Vol. 132(8),: pp. 844–852.
  10. Denini, F. (2009). “Delays on large construction projects in Libya.” In Abu Bakar (ed). Proceedings: The 3rd International Conference on Built Environment in Development Countries (Sustainable Built Environment: Tomorrow‟s Agenda Today).
  11. Edwards, P.J. and Bowen, P.A. (1998). ““Risk and risk management in construction: a review and directions for research””, Engineering, Construction and Architectural Management. ,Vol. 15, pp. 339 -349.
  12. Frimpong, Y, Oluwoye, J, and Crawfod, L (2003): Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Countries; Ghana as a Case Study: International Journal of Project Management; Vol. 21: pp. 321-326.
  13. Mark, F. Cohen,P. and Glen, J. (2004). Risks and risk analysis in construction management, In Proceedings of the CIB W65, Symposium on Organization and 90 Management of Construction, US National Academy of Science, Washington DC.
  14. Mustafa, A. (2000). “Project Management in Construction”. Oxford, Blackwell Science Ltd.
  15. Ofori G, (2007). “Construction in Developing Countries”, Construction Management and Economics, Vol. 25:1, pp. 1-6.
  16. Ofori, G. (1994). ““Construction technology development:” Role of an appropriate policy”. Engineering, Construction and Architectural Management, Vol. 1(2), pp. 147– 168.
  17. Ofori, G. (2006). “Construction in developing countries: A research agenda”. Journal of Construction in Developing Countries.
  18. Oladapo I.O (2015): Problems of construction industry in Nigeria; IABSE reports of the working commissions; available online at file:///C:/Users/ilohi/Downloads/bse-re001_1977_26_a_029_d.pdf assessed 03/08/2015.